The Amazon ORH3 Logistics Center, located at 53 Sturbridge Road in Charlton, Massachusetts, is a 2.8 million-square-foot state-of-the-art distribution facility designed to support Amazon’s expansive supply chain operations. Completed in 2024, the project was led by Sagamore Plumbing & Heating as the mechanical contractor, with BL Companies providing engineering expertise.
Testing, Adjusting, and Balancing (TAB) was performed to optimize HVAC and ventilation systems, ensuring efficient climate control, air quality, and energy performance throughout the massive facility. This project represents a significant investment in logistics infrastructure, enhancing Amazon’s ability to meet growing consumer demand with speed and efficiency.
Optimize your building’s performance—start with a TAB quote.